Winterhalter-ltd-CONNECTED-WASH-terms_UK_en.pdf
Connection diagram PT Series V01 (2013-06/2021)
Operating instructions PT Series V01 (2013-06/2021)
Technical data MTR V01 09/2012-04/2024
Technical data MTR V01 (steam heated) 09/2012-04/2024
Technical data MTF (steam heated)
Filling with regeneration salt
Operating instructions SP 70R, SP 16K
Operating instructions SP 166L
Operating instructions SP 166Z
Connecting the machine to the network (WL Setup app - Android)
Connecting the machine to the network (WL Setup app - iOS)
Assembly instructions external dosing device for PT-500
Assembly instructions external dosing device for PT Series V01
1 2 3 4 5 6 7 8 9 10 11 12 13 14